Industrial real estate 4
Back to projects
IndustrialOngoing

Industrial real estate 4

Project overview

The project shows the stage of insulating the foundations and basement (basement) to protect it from ground water in an industrial area in the Kingdom: Waterproofing: Covering the entire floor and walls with a layer of black bitumen to prevent moisture leakage.Structural structure: Equipping the deep pit and drilling the tank/elevator, and starting the construction of the walls with cement block.Materials on site: The presence of insulation coils and protective materials ready for installation to protect the upcoming concrete structure.

Industrial real estate 4
Industrial real estate 4 - 1
Industrial real estate 4 - 2
Project details
Type
Location
Saudi Arabia
Built-up area
Year
2026